Late popping Nadelbäume on the Inntal/Brennerbahn upgrade from fsclips.

  • Ok, this is almost a beginner question (sorry).


    On the wonderful Brennerbahn upgrade from fsclips the Nadelbäume are very late in loading. Is there any way i can change the loading distance for this asset?


    Is it a global route parameter, or would i have to do it per tree or per asset block?

    Ich bin der Musikant mit Taschenrechner in der Hand.

  • Kim_olesen1

    Hat den Titel des Themas von „Late popping Nadelbäume on the Inntal/Brennerbahn upgrade from fclips.“ zu „Late popping Nadelbäume on the Inntal/Brennerbahn upgrade from fsclips.“ geändert.