This scenario is based on the real timetables of IC119 on the 23/08/2013.This train drives from Münster to Innsbruck mostly with DB IC coaches.The traction between Ulm and Lindau is mostly provided by two BR218.All passenger trains you will meet are following there real timetable.The only difference to reality is the stock used, this because of the shortage in Austrian stock like Talent units etc…The scenario will start with your BR1016 in the siding in Lindau.Prepare your locomotive and drive past the second shunting signal (Y2), change ends there and drive up to platform 3 where you need to couple the coaches if the IC train.Then open the doors and change ends again and prepare yourself for the ride.Watch the signals on route especially on the Arlbergbahn because there is one freight train descending and one Railjet.
Zusätzliche Informationen
- Autor
- Michiels Jorik
Dateien
-
ic119_scenario .zip
488,94 kB (716 Downloads)


